Projects

Holmestown Landfill

  • Civil Works €1.1m
  • Bulk Excavation 2000 cu. mets.
  • 2 Precast Concrete SBR Tanks(17Mx6M)
  • 2 Leachate/Storm P.C. Tanks (9Mx4.5M
  • Control Building & ESB Sub-station
  • Sludge Treatment Building
  • Site Services, roads & pavements


Download Case Study

Carney Sewerage Scheme

  • Civil Works €550K
  • Bulk Excavation 1500 cu.mets.
  • P.C. & in-situ R.C. Tanks & Pumping Station
  • Control Building
  • Tidal Outfall
  • Site Services, Bases & Plinths
  • Access Road


Download Case Study

Sion Cross, Carlow Town

  • Civil Works €250K
  • Sheet-piled Cofferdam
  • R.C. Structures
  • Raw-water Pipeline, 600 dia. D.I.
  • Site services, Roads & Pavements
  • Site Pallisade Fencing


Download Case Study

Terryland Water Treatment Works

  • 6 Week Construction Period
  • Capital Works €1.1M
  • R.C. Chambers
  • Modification of Existing R.C. Structures
  • Laying of 1000 mm dia. D.I. Pipeline
  • Ducts & Duct Chambers
  • Liaison with U.V. System Specialist


Download Case Study

Thurles Wastewater Treatment Plant

  • Site Preparation & Ground-works
  • Precast Concrete Piling
  • R.C. Structures
  • S.S. Framed/Cladded Sludge Reception Centre
  • Inter-connecting Pipework & Ductwork
  • Bases & Plinths
  • Site Roads


Download Case Study

Birr Urban Renewal

  • Civil Works €60K
  • Demolition/Removal Existing Footpaths/Street-furniture
  • Laying P.C. Kerbing & Paviors
  • Replacement of U/G Services
  • Carriageway Resurfacing
  • Maintaining Traffic Free-flow


Download Case Study