Projects
|
Holmestown Landfill
- Civil Works €1.1m
- Bulk Excavation 2000 cu. mets.
- 2 Precast Concrete SBR Tanks(17Mx6M)
- 2 Leachate/Storm P.C. Tanks (9Mx4.5M
- Control Building & ESB Sub-station
- Sludge Treatment Building
- Site Services, roads & pavements
|
 Download Case Study  |
 |
|
Carney Sewerage Scheme
- Civil Works €550K
- Bulk Excavation 1500 cu.mets.
- P.C. & in-situ R.C. Tanks & Pumping Station
- Control Building
- Tidal Outfall
- Site Services, Bases & Plinths
- Access Road
|
 Download Case Study  |
 |
|
Sion Cross, Carlow Town
- Civil Works €250K
- Sheet-piled Cofferdam
- R.C. Structures
- Raw-water Pipeline, 600 dia. D.I.
- Site services, Roads & Pavements
- Site Pallisade Fencing
|
 Download Case Study  |
 |
|
Terryland Water Treatment Works
- 6 Week Construction Period
- Capital Works €1.1M
- R.C. Chambers
- Modification of Existing R.C. Structures
- Laying of 1000 mm dia. D.I. Pipeline
- Ducts & Duct Chambers
- Liaison with U.V. System Specialist
|
 Download Case Study  |
 |
|
Thurles Wastewater Treatment Plant
- Site Preparation & Ground-works
- Precast Concrete Piling
- R.C. Structures
- S.S. Framed/Cladded Sludge Reception Centre
- Inter-connecting Pipework & Ductwork
- Bases & Plinths
- Site Roads
|
 Download Case Study  |
 |
|
Birr Urban Renewal
- Civil Works €60K
- Demolition/Removal Existing Footpaths/Street-furniture
- Laying P.C. Kerbing & Paviors
- Replacement of U/G Services
- Carriageway Resurfacing
- Maintaining Traffic Free-flow
|
 Download Case Study  |
|
|