|
|
Industrial ETP
|
Wexford Creamery Design and Build Contract
- BOD: 3400 kg/day
- P.E.: 56,000
- 2No. Anoxic Tanks (N removal)
- 2 No. SBRs/FBDA (25m dia. x 5.5m deep)
- Sludge Dewatering
- Capital Works €1,200,000
|
 Download Case Study  |
 |
|
Kildare Chilling Ltd Effluent Wastewater Treatment Plant
- PE 20,000
- Capital Works €190 K
- Plant Upgrade to 1200 kg/d BOD & 2000 kg/d SS
- Extended Aeration (FBDA) / Submersible Mixers
- Discharge Standard 25/35 BOD/SS and 20mg/l OFG
|
 Download Case Study  |
 |
|
Millipore Ireland Ltd Design & Build Contract
- PE 4000
- Capital Works €450K
- BOD 250 kg/d
- pH Correction
- Extended Aeration (Liquid Injection)
- Sludge Dewatering by Centrifuge to 18%DS
- Discharge Standard 25/35 BOD/SS
|
 Download Case Study  |
 |
|
Cantrell & Cochrane Design and Build Contract
- PE 5000
- BOD : 900 mg/
- 18 Week Programme
- Flow Balancing/pH Correction
- Extended Aeration / FBDA
- Discharge Standard 25mg/l BOD, 35mg/l SS
|
 Download Case Study  |
 |
|
Glanbia Foods Edenderry Effluent Treatment Plant (ETP)
- PE 22,000
- Capital Works €250 K
- BOD : 1000kg/day, P: 100mg/l, OFG :80mg/l
- Anoxic & Extended Aeration (Surface Aeration)
- Final Effluent to Municipal Sewer
- Discharge Standard 75mg/l BOD, 15mg/l P, 10mg/l OFG
|
 Download Case Study  |
 |
|
Shannon Town Co. Clare Effluent Treatment Plant
- O&M Contract
- Value €500K per annum
- Industrial ETP 17000 PE
- Municipal WWTP 12500 PE
- 17 Pumping Stations
- EPA Licenced Landfill (2500 tonnes/annum)
|
 Download Case Study  |
 |
|
Galtee Meats Mitchlestown Effluent Treatment Plant
- Design Flow 90 m3/hr
- Capital Works €150K
- Drum-type Rotostrainer/ to 1mm solids
- Dissolved Air Flotation Plant/ 200kg OFG/day
- Discharge Standard 10mg/l OFG
|
 Download Case Study  |
|
|