Municipal WTP
|
Bantry WSS
- Design/Build Contract
- Design Flow:- 56m3/hr
- Upgrade Works at Cahernacrin WSS
- Treatment Process comprising of Floculation, Clarification, Filtration, Chemical Dosing & UV Disinfection
- Capital Works €990,000
|
 |
 |
|
Terryland WTW Upgrade
- Design/Build Contract
- Design Flow:- 55,000 m3/day
- Upgrade of the existing treatment processes such as Floculation, Clarification, Filtration & Chemical Dosing
- New Intake Screening provided
- Civil Works included
- Capital Works €3,500,000
|
 |
 |
|
East Waterford Water Supply Improvement Scheme
- Plant Upgrading / DB and M&E Contracts
- 58.5 Ml/day
- Capital Works €4.4M
- Raw Water Pumping / 3No 400kw VT Pumps
- Treated Water Pumping / 2No 90kw & 2 No 30kw Pumps
- Enhanced Pumping
- Rapid Gravity Filtration
- Sludge Dewatering
|
 Download Case Study  |
 |
|
Sandyford HL WSS
- M&E Contract
- New portable water pumping stations at Sandyford & Stillorgan
- Project comprises of potable water pumping, surge control, pipework & lifting e/q at each station
- On-site Electrochlorination Plant
- Controls & SCADA
- 19 No. Telemetry Outstations
- Capital Works €1,200,000
|
 |
 |
|
Leixlip-Ballycoolen Water Supply Scheme M&E Contract
- Pumping, Water-softening and Electro-Chlorination Contract
- Capital Works €1.1M
- 235 Ml/day
- Capital Works €1.2M
- 2 No. 160 kW Centrifugal Pumps
- Surge Suppression
- Reservoir Monitoring
- Standard of Water into Supply to SI No.278 of 2007
|
 Download Case Study  |
 |
|
Athlone Water Treatment Plant M&E Installation
- Plant Upgrading/ M&E Contract
- 12 ML/day
- Capital Works €1.0M
- Raw Water Pumping
- Enhanced Settlement
- Standard of Water into Supply to SI No 278 of 2007
|
 Download Case Study  |
 |
|
Sion Cross (Carlow) WTP Water Treatment Plant Upgrade
- Capacity Upgrade
- 4.5 Ml/day
- €950K Capital Works
- Raw Water Pumping
- Enhanced Settlement
- Uprated Filtration
- ICA/SCADA
|
 Download Case Study  |
 |
|
New Terryland Water Treatment Works M&E Installation Contract
- Cryptosporidium Outbreak/WTP Upgrading
- Capital Works €1.1M
- “Boil” Notice/ HSE and EPA
- 6 Week Programme
- UV Disinfection System
- Standard of Water into Supply to SI No 278 of 2007
|
 Download Case Study  |
 |
|
Caherciveen Water Supply Scheme Water Treatment Plant Upgrade
- Plant Upgrading/M&E Contract
- 1.8 Ml/day
- €500K Capital Works
- Ozone Treatment System
- Colour Monitoring
- Reservoir Monitoring
- Booster Installation
- ICA/SCADA
|
 Download Case Study  |
|
|