Municipal WTP

Bantry WSS

  • Design/Build Contract
  • Design Flow:- 56m3/hr
  • Upgrade Works at Cahernacrin WSS
  • Treatment Process comprising of Floculation, Clarification, Filtration, Chemical Dosing & UV Disinfection
  • Capital Works €990,000

Terryland WTW Upgrade

  • Design/Build Contract
  • Design Flow:- 55,000 m3/day
  • Upgrade of the existing treatment processes such as Floculation, Clarification, Filtration & Chemical Dosing
  • New Intake Screening provided
  • Civil Works included
  • Capital Works €3,500,000

East Waterford Water Supply Improvement Scheme

  • Plant Upgrading / DB and M&E Contracts
  • 58.5 Ml/day
  • Capital Works €4.4M
  • Raw Water Pumping / 3No 400kw VT Pumps
  • Treated Water Pumping / 2No 90kw & 2 No 30kw Pumps
  • Enhanced Pumping
  • Rapid Gravity Filtration
  • Sludge Dewatering

Download Case Study

Sandyford HL WSS

  • M&E Contract
  • New portable water pumping stations at Sandyford & Stillorgan
  • Project comprises of potable water pumping, surge control, pipework & lifting e/q at each station
  • On-site Electrochlorination Plant
  • Controls & SCADA
  • 19 No. Telemetry Outstations
  • Capital Works €1,200,000

Leixlip-Ballycoolen Water Supply Scheme M&E Contract

  • Pumping, Water-softening and Electro-Chlorination Contract
  • Capital Works €1.1M
  • 235 Ml/day
  • Capital Works €1.2M
  • 2 No. 160 kW Centrifugal Pumps
  • Surge Suppression
  • Reservoir Monitoring
  • Standard of Water into Supply to SI No.278 of 2007

Download Case Study

Athlone Water Treatment Plant M&E Installation

  • Plant Upgrading/ M&E Contract
  • 12 ML/day
  • Capital Works €1.0M
  • Raw Water Pumping
  • Enhanced Settlement
  • Standard of Water into Supply to SI No 278 of 2007

Download Case Study

Sion Cross (Carlow) WTP Water Treatment Plant Upgrade

  • Capacity Upgrade
  • 4.5 Ml/day
  • €950K Capital Works
  • Raw Water Pumping
  • Enhanced Settlement
  • Uprated Filtration
  • ICA/SCADA

Download Case Study

New Terryland Water Treatment Works M&E Installation Contract

  • Cryptosporidium Outbreak/WTP Upgrading
  • Capital Works €1.1M
  • “Boil” Notice/ HSE and EPA
  • 6 Week Programme
  • UV Disinfection System
  • Standard of Water into Supply to SI No 278 of 2007

Download Case Study

Caherciveen Water Supply Scheme Water Treatment Plant Upgrade

  • Plant Upgrading/M&E Contract
  • 1.8 Ml/day
  • €500K Capital Works
  • Ozone Treatment System
  • Colour Monitoring
  • Reservoir Monitoring
  • Booster Installation
  • ICA/SCADA

Download Case Study