Municipal WWTP
Templemore SS
- Design/Build/Operate Contract
- 20 yr O&M Contract
- P.E. 6000
- 2 No. Treatment Streams incorporating Aerator Wheel (STM), Clarifier
- On-site Sludge Thickening & Dewatering
- Odour Control
- Capital Works €3,400,000
|
 Download Case Study  |
 |
Bantry SS
- M&E Contract
- P.E. 6000
- Treatment comprises of Screening/Grit Removal, Oxidation Ditch, Clarifier, Thickening & Dewatering
- Odour Control
- Nutrient Removal (0.5 mg/l NH4 & 2 mg/l P)
- Capital Works €2,000,000
|
 Download Case Study  |
 |
Leitrim T&V DBO
- Design/Build/Operate Contract
- 20 yr O&M Contract
- P.E. - 10 No. WWTP’s ranging from 100PE to 2,600PE
- Package Type Treatment Systyem incorporating Aerator Wheel (STM), Clarifier etc.
- 15 No. Outlying PS’s
- On-site Sludge Thickening
- Capital Works €10,400,000
|
 Download Case Study  |
 |
Carrick-on-Shannon
- Design/Build/Operate Contract
- 20 yr O&M Contract
- P.E. 11,500
- Fine Bubble Diffused Aeration System
- On-site Sludge Thickening & Dewatering
- 2 no. New PS’s & refurbishment of 7 no. PS’s
- Capital Works €7,900,000
|
 Download Case Study  |
 |
Thurles Wastewater Treatment Plant Upgrading Works
- Plant Upgrade DB Contract
- PE 15000
- €1.7M Capital Works
- Inlet Works
- FBDA Aeration
- Sludge Reception Centre
- ICA/SCADA
|
 Download Case Study  |
 |
Castlerea Sewerage Scheme
- M&E Contract
- PE 5000
- Capital Works €3.0M
- Extended Aeration FBDA/Submersible Mixers
- Sludge Dewatering by Centrifuge 18% DS
- Odour Control/Biofilter
- Discharge Standard 25/35 BOD/SS and 2mg/Lp
|
 Download Case Study  |
 |
Ballina Main Drainage Wastewater Treatment Plant
- Plant Upgrading/M&E Contract
- €2.0M Capital Works
- PE 35000
- 6 Pumping Stations
- GRP-roofed Primary Tanks
- FBDA Aeration
- P-Reduction
- Odour Control
- ICA/SCADA
|
 Download Case Study  |
 |
Monasterevin Sewerage Scheme M&E Installation, Operation & Maintenance Contract
- M&E Contract
- Short Term O&M Contract
- P.E.9000
- Extended Aeration / FBDA
- P reduction to 0.7 mg/l
- Odour Control
- Capital Works €2,200,000
|
 Download Case Study  |
 |
Shannon Airport Design Build Operate Contract
- DB & 20yr O & M Contract
- PE 7500
- Performance Management System ( PMS )
- BOD : 20 / SS : 30 / P : 2 / TN : 10
- SCADA System for WWTW & Outlying PS
- Capital Works €2,300,000
|
 Download Case Study  |
 |
Ballyheigue Sewerage Scheme Wastewater Treatment Plant
- New Plant M&E Contract
- €1.85 Capital Works
- PE 4300
- FBDA Aeration
- Odour Control
- UV Disinfection/Blue Flag Beach
- ICA/SCADA
|
 Download Case Study  |
 |
Carlow Town Wastewater Treatment Plant Upgrading
- Plant Upgrading/M&E Contract
- PE 36000
- Capital Works €800K
- FBDA to replace Surface Aeration
- P-reduction by Simultaneous Precipitation
- Discharge Standard 25/35 BOD/SS and 2mg/l P
|
 Download Case Study  |
 |
Bunclody SS
- Design/Build/Operate Contract
- 20 yr O&M Contract
- P.E. 6500
- 2 No. Treatment Streams incorporating Aerator Wheel (STM), Clarifier
- On-site Sludge Thickening & Dewatering
- Odour Control
- Capital Works €2,850,000
|
 |
|
|